[Top][All Lists]
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[commit-cp] [bugs #11224] GregorianCalendar.computeTime - month out of r
From: |
anonymous |
Subject: |
[commit-cp] [bugs #11224] GregorianCalendar.computeTime - month out of range |
Date: |
Sun, 05 Dec 2004 22:37:48 -0500 |
User-agent: |
Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.8a6) Gecko/20041129 Firefox/0.9.1+ |
This mail is an automated notification from the bugs tracker
of the project: classpath.
/**************************************************************************/
[bugs #11224] Full Item Snapshot:
URL: <http://savannah.gnu.org/bugs/?func=detailitem&item_id=11224>
Project: classpath
Submitted by: 0
On: Sun 12/05/2004 at 22:31
Category: classpath
Severity: 5 - Average
Resolution: None
Privacy: Public
Assigned to: None
Status: Open
Platform Version: None
Summary: GregorianCalendar.computeTime - month out of range
Original Submission: Here's the original stack traces from running Apache
Axis' tests using IKVM:
http://nagoya.apache.org/~dims/ikvm-report/test/encoding/PackageTests.html
See attached Test.java for stripped down test case.
Thanks,
dims
File Attachments
-------------------
-------------------------------------------------------
Date: Sun 12/05/2004 at 22:31 Name: Test.java Size: 2.68KB By: None
Stripped down test case for 3 of the 5 failures in Apache Axis
http://savannah.gnu.org/bugs/download.php?item_id=11224&item_file_id=1948
For detailed info, follow this link:
<http://savannah.gnu.org/bugs/?func=detailitem&item_id=11224>
_______________________________________________
Message sent via/by Savannah
http://savannah.gnu.org/
- [commit-cp] [bugs #11224] GregorianCalendar.computeTime - month out of range,
anonymous <=