dolibarr-bugtrack
[Top][All Lists]
Advanced

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[Dolibarr-bugtrack] [Bug #788] Date of linked interventions are not show


From: Doliforge
Subject: [Dolibarr-bugtrack] [Bug #788] Date of linked interventions are not shown
Date: Fri, 03 May 2013 15:18:50 +0200

Doliforge
Is this email not displaying correctly?
update email preferences.

Date of linked interventions are not shown

Latest modifications

2013-05-03 15:18 (Europe/Paris)
Changes:
  • Status: 
OpenClosed

Answer now

Snapshot

 Details
Submitted by:  Marcos García (marcosgdf) Submitted on:  2013-03-30 15:11
Last Modified On:  2013-05-02 13:58 
Summary:  Date of linked interventions are not shown
Description:  When listing linked references to a project, table of interventions shows a date column, but no data is displayed in it
Step to reproduce bug:  1. Create a project
2. Create an intervention and link it to the project
3. Validate it
4. Go to the project and to "References" tab
5. See there's nothing in the date column
Version:  3.3.1 Category:  Module: Projects
Severity:  5 - Major OS Type/Version:  
PHP version:   Database type and version:  
 Status
Status:  Closed Assigned to:  HENRY Florian (fhenry)
Resolution:  Fixed 

Comments

HENRY Florian 2013-05-02 13:58
The bug has been corrected. Pull request send inside GIT sources
(http://www.github.com/Dolibarr/dolibarr) and waiting to merge
into develop branch.
HENRY Florian 2013-05-02 13:57
I put the validation date of intervention in this column
https://github.com/Dolibarr/dolibarr/pull/908
https://github.com/FHenry/dolibarr/commit/7e47b37adedeed0e58caf39251c667532b6bb63b


reply via email to

[Prev in Thread] Current Thread [Next in Thread]