Hi,
I've found org-mode to be an excellent tool to plan tasks and have recently started using it to track time/effort.
1) Is it possible to do a 'cross-tab' of time spent by both tasks and tags? Something like the following:
| Tasks | Tag1 | Tag2 |
|-------+------+------|
| Task1 | 2:30 | 1:30 |
| Task2 | 0:45 | 2:00 |
|-------+------+------|
| Total | 3:15 | 3:30 |
2) I like using variable width fonts as they are much easier to read, but this doesn't work with clock-tables or column-mode. Is there anyway to set a fixed-width font for part of a buffer? (ie for a Begin-End block) Or to toggle between a variable-width and a fixed-width font?
Many thanks for the help and the excellent tool.
M.