[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: [O] logdone enhancement
From: |
Arun Persaud |
Subject: |
Re: [O] logdone enhancement |
Date: |
Wed, 27 Feb 2013 10:39:03 -0800 |
User-agent: |
Mozilla/5.0 (X11; Linux x86_64; rv:17.0) Gecko/20130215 Thunderbird/17.0.3 |
Hi
>> * project
>> ** TODO headline :repeat:
>> a longer description of what the todo item is about
>> SCHEDULED: <2013-06-18 Tue +1m>
>
> The SCHEDULED line should be right after the headline, see the manual.
> It can sometimes work when it is on another line, but this is
> accidental, you should put the line right after the headline.
I just tried
* project
** TODO headline :repeat:
SCHEDULED: <2013-06-18 Tue +1m>
a longer description of what the todo item is about
but this will still add the state-changed-line between the SCHEDULED
line and the longer description (it will also add the property drawer
there, if it doesn't exist). If you track some daily changes this can
move the longer description away from the top quite fast, which is what
I would like to avoid.
Arun