gnash-dev
[Top][All Lists]
Advanced

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [Gnash-dev] Possible regression: Gnash slow on scene changes


From: strk
Subject: Re: [Gnash-dev] Possible regression: Gnash slow on scene changes
Date: Thu, 2 Aug 2007 16:28:25 +0200

On Thu, Aug 02, 2007 at 10:11:23AM +0200, Udo Giacomozzi wrote:
> I noticed that the "Souvenir" movie (download it from
> http://www.atomfilms.com/film/souvenir.jsp ) freezes Gnash for a
> couple of seconds between scene changes:
> 
> ...
> Effective frame rate: 16.67 fps (min 0.54, avg 22.64, max 25.42, 2662 frames 
> in 117.6 secs total)
> Effective frame rate: 24.00 fps (min 0.54, avg 22.64, max 25.42, 2665 frames 
> in 117.7 secs total)
> Effective frame rate: 0.16 fps (min 0.16, avg 19.47, max 25.42, 2668 frames 
> in 137.0 secs total)
> Effective frame rate: 24.79 fps (min 0.16, avg 19.48, max 25.42, 2671 frames 
> in 137.1 secs total)
> Effective frame rate: 24.00 fps (min 0.16, avg 19.48, max 25.42, 2674 frames 
> in 137.3 secs total)
> ...
> 
> Older Gnash versions did not have this problem (but I get the feeling
> that Gnash performs better in average).
> 
> Perhaps caused by timeline redesigns? Garbage collector?

There are compile-time defines to verify both. 
What are "scenes", btw ?

--strk;




reply via email to

[Prev in Thread] Current Thread [Next in Thread]