phpgroupware-tracker
[Top][All Lists]
Advanced

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[Phpgroupware-tracker] [Bug #1547] Calendar showing two October 27ths


From: nobody
Subject: [Phpgroupware-tracker] [Bug #1547] Calendar showing two October 27ths
Date: Tue, 05 Nov 2002 11:54:26 -0500

=================== BUG #1547: LATEST MODIFICATIONS ==================
http://savannah.gnu.org/bugs/?func=detailbug&bug_id=1547&group_id=509

Changes by: Scott Ewen <address@hidden>
Date: 2002-Nov-05 16:54 (GMT)

------------------ Additional Follow-up Comments ----------------------------
I saw a comment on the web about the problem being fixed by changing the first 
day of the week to Sunday.  It did fix the problem with the double day 27, but 
I still have the problem where the program thinks it is one day in the future, 
i.e. this is Tuesday November 5th, which shows up correctly on the Calendar, 
but the Calendar keeps displaying Wednesday (Nov 6th).

I was going to update by downloading the latest version on the phpgroupware.org 
web site.  I don't know how to cvs?  I don't see the command.  The files for 
phpGroupWare on the Macintosh XServer are in the following directory:

/Library/WebServer/Documents/phpgroupware/

Thanks.

Scott E.



=================== BUG #1547: FULL BUG SNAPSHOT ===================


Submitted by: sewen                     Project: phpGroupWare                   
Submitted on: 2002-Oct-29 16:05
Category:  calendar                     Bug Group:  0.9.14 release              
Severity:  5 - Major                    Priority:  Normal                       
Resolution:  None                       Assigned to:  ralfbecker                
Status:  Open                           Component Version:  TGZ                 
Platform Version:  BSD                  Reproducibility:  Every Time            

Summary:  Calendar showing two October 27ths

Original Submission:  I'm not sure if this is related to Bug #1537, but my 
October calendar shows two day 27, Sunday 27 and Monday 27.  The calendar also 
thinks the real date is shifted down one day.  The displayed date is shifted 
down one more day.  I checked other months and they seem ok (no double days).  
But, I also checked October 2003 and it has the same problem.

phpGroupWare is running on a new MacOSX XServer with the latest Apache, MySQL 
and PHP (I also have the problem on a Compaq laptop running Mandrake 9.0).

Thanks.


Follow-up Comments
*******************

-------------------------------------------------------
Date: 2002-Nov-05 16:54             By: sewen
I saw a comment on the web about the problem being fixed by changing the first 
day of the week to Sunday.  It did fix the problem with the double day 27, but 
I still have the problem where the program thinks it is one day in the future, 
i.e. this is Tuesday November 5th, which shows up correctly on the Calendar, 
but the Calendar keeps displaying Wednesday (Nov 6th).

I was going to update by downloading the latest version on the phpgroupware.org 
web site.  I don't know how to cvs?  I don't see the command.  The files for 
phpGroupWare on the Macintosh XServer are in the following directory:

/Library/WebServer/Documents/phpgroupware/

Thanks.

Scott E.

-------------------------------------------------------
Date: 2002-Nov-05 13:42             By: ralfbecker
I can't reproduce that. 
Can u please update your 0.9.14 from cvs and check if the prob still exist. 
Please let me know and/or close the bug on savanah.
To update go to your phpgroupware-install-dir and type the following cvs 
command: cvs update

Ralf


CC list is empty


No files currently attached


For detailed info, follow this link:
http://savannah.gnu.org/bugs/?func=detailbug&bug_id=1547&group_id=509




reply via email to

[Prev in Thread] Current Thread [Next in Thread]