I have played with Planner and made a list of remaining tasks. Of
course, task duration should not be taken for granted. ;)

I join the planner and html version of the project (for those who don't
have Planner).

This is done more to test Planner that to do real planning (if such a
thing is possible for a free software project ;).

Yours,
d.
-- 
 David MENTRÉ <address@hidden>

Demexp

Company: www.demexp.org
Start Date: September 29, 2004
Finish Date: January 4, 2005
Duration: 97d 17h
Report Date: September 29, 2004

Gantt Chart


*** Note: Gantt chart requires CSS capability. ***
WBS Name Work Week 40, 2004 Week 41, 2004 Week 42, 2004 Week 43, 2004 Week 44, 2004 Week 45, 2004 Week 46, 2004 Week 47, 2004 Week 48, 2004 Week 49, 2004 Week 50, 2004 Week 51, 2004 Week 52, 2004
29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
1 Finish graphical client 5d
1.1 demexp main window 5d
1.2 classification window 5d
1.3 manage tags window 1d
john
2 Delegation 20d
2.1 Design delegation 5d
2.2 Implement delegation 15d
3 Save & load of bases 20d
3.1 xml dtd 5d
3.2 xml save & load 5d
3.3 database interface design 5d
3.4 database interface coding 15d
4 Internationalization 70d
4.1 Design or found i18n infrastructure 5d
4.2 Code i18n infrastructure 5d
4.3 Client internationalization 10d
4.4 Server internationalization 10d
4.5 Design of base i18n infrastructure 10d
4.6 Coding of base i18n infrastructure 15d
5 Security 26d
5.1 analysis of possible DDoS 1d
5.2 secure server against DDoS 1d
5.3 secure client/server(s) communication 1d
5.4 protocol to guarantee vote anonymity 1d

Tasks

WBS Name Start Finish Work Priority Cost Notes
1 Finish graphical client Sep 29 Oct 5 5d
1.1 demexp main window Sep 29 Oct 5 5d
1.2 classification window Sep 29 Oct 5 5d
1.3 manage tags window Sep 29 Sep 29 1d
2 Delegation Oct 5 Nov 2 20d
2.1 Design delegation Oct 5 Oct 12 5d
2.2 Implement delegation Oct 12 Nov 2 15d
3 Save & load of bases Nov 2 Nov 30 20d
3.1 xml dtd Nov 2 Nov 9 5d
3.2 xml save & load Nov 9 Nov 16 5d
3.3 database interface design Nov 2 Nov 9 5d
3.4 database interface coding Nov 9 Nov 30 15d
4 Internationalization Sep 29 Jan 4 70d
4.1 Design or found i18n infrastructure Sep 29 Oct 5 5d
4.2 Code i18n infrastructure Oct 5 Oct 12 5d
4.3 Client internationalization Oct 12 Oct 26 10d
4.4 Server internationalization Oct 12 Oct 26 10d
4.5 Design of base i18n infrastructure Nov 30 Dec 14 10d
4.6 Coding of base i18n infrastructure Dec 14 Jan 4 15d
5 Security Sep 29 Nov 3 26d
5.1 analysis of possible DDoS Sep 29 Sep 29 1d
5.2 secure server against DDoS Sep 29 Sep 30 1d
5.3 secure client/server(s) communication Sep 29 Sep 29 1d
5.4 protocol to guarantee vote anonymity Nov 2 Nov 3 1d

Resources

Name Short name Type Group Email Cost
David MENTRE david Work address@hidden 0
John Skaller john Work 0

Attachment: demexp-schedule.planner
Description: demexp task list (planner)


reply via email to