gnash-dev
[Top][All Lists]
Advanced

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[Gnash-dev] What is left do to o before a new release can be made?


From: Petter Reinholdtsen
Subject: [Gnash-dev] What is left do to o before a new release can be made?
Date: Thu, 9 Jan 2014 07:41:39 +0100
User-agent: Mutt/1.5.20 (2009-12-10)

I asked on #gnash about the current status and what need to be fixed
before a new release can be made, and was told by gg0 that there is
one security issue and one blocking bug holding back the next release:

#40315 tummy_trouble.swf segfaults
  <URL: http://sv.gnu.org/bugs/?40315 >

#39989 Assertion `(_shape1.subshapes().size() ==
       _shape2.subshapes().size()) && (_shape2.subshapes().size() ==
       1)' failed.
  <URL: http://sv.gnu.org/bugs/?39989 >

Both was introduced after the last release, if I understand the bug
reports.  As far as I can tell, neither of these bugs are detected by
'make check' at the moment, making me suspect that a good start would
be to add a testsuite check for these problems.

There is also 13 bugs with severity important that would be nice to
have fixed before a new release is made:
<URL: 
https://savannah.gnu.org/bugs/index.php?go_report=Apply&group=gnash&func=browse&set=custom&msort=0&report_id=101&advsrch=0&status_id=1&resolution_id=0&submitted_by=0&assigned_to=0&category_id=0&severity=7&summary=&details=&sumORdet=0&history_search=0&history_field=0&history_event=modified&history_date_dayfd=8&history_date_monthfd=1&history_date_yearfd=2014&chunksz=50&spamscore=5&boxoptionwanted=1#options
 >.

Are there other problems holding back the release?

-- 
Happy hacking
Petter Reinholdtsen



reply via email to

[Prev in Thread] Current Thread [Next in Thread]