[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: Fwd: Debian 13 (trixie) freeze schedule released
From: |
Yavor Doganov |
Subject: |
Re: Fwd: Debian 13 (trixie) freeze schedule released |
Date: |
Sun, 26 Jan 2025 18:11:54 +0200 |
User-agent: |
Wanderlust/2.15.9 (Almost Unreal) SEMI-EPG/1.14.7 (Harue) FLIM-LB/1.14.9 (Gojō) APEL-LB/10.8 EasyPG/1.0.0 Emacs/29.4 (x86_64-pc-linux-gnu) MULE/6.0 (HANACHIRUSATO) |
richard wrote:
> > I think it would probably be possible to avoid the library
> > version change and do a 1.30.1 release instead, though that would
> > need careful checking and possibly a degree of rewriting any
> > changes that break abi.
I think there was at least one incompatible change, although I may be
wrong. (I stopped receiving those mails from git push operations.)
> > However, am I right in thinking that would be pointless if GUI
> > and back need a library version change at the next release
> > anyway?
Yes, you are basically right that it won't help us much if Base has a
point release (in case GUI/Back have a bump).