[Top][All Lists]
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[Guile-commits] Hydra job gnu:guile-master:coverage build 630620: Succes
From: |
Hydra Build Daemon |
Subject: |
[Guile-commits] Hydra job gnu:guile-master:coverage build 630620: Success |
Date: |
Mon, 13 Sep 2010 01:26:06 +0200 |
Hi,
This is to let you know that Hydra build 630620 of job
gnu:guile-master:coverage has changed from 'Failed with non-zero exit code' to
'Success'.
Complete build information can be found on this page:
http://hydra.nixos.org/build/630620
A summary of the build information follows:
Build ID: | 630620
Nix name: | guile-coverage-1.9.12.18-cf7e
Short description: | Coverage analysis
Maintainer(s): | address@hidden
System: | x86_64-linux
Derivation store path: |
/nix/store/x4ajrhqyycsyz4m0nrhh2n8njsbcz1yh-guile-coverage-1.9.12.18-cf7e.drv
Output store path: |
/nix/store/fk6krzih2na54l4iifch327lb59xj018-guile-coverage-1.9.12.18-cf7e
Time added: | 2010-09-13 01:26:05
Build started: | 2010-09-12 23:58:56
Build finished: | 2010-09-13 01:26:05
Duration: | 5229s
The build inputs were:
Name | Type | Value
------------+-------+-------------------------------------------------------------
hydraConfig | svn |
https://svn.nixos.org/repos/nix/hydra-config/gnu/trunk:23734
nixpkgs | svn | https://svn.nixos.org/repos/nix/nixpkgs/trunk:23737
tarball | build | 630610
Regards,
The Hydra build daemon.
[Prev in Thread] |
Current Thread |
[Next in Thread] |
- [Guile-commits] Hydra job gnu:guile-master:coverage build 630620: Success,
Hydra Build Daemon <=