|
From: | Lynch, Harold |
Subject: | Question about process scheduleing |
Date: | Thu, 26 Aug 2004 09:55:02 -0400 |
I'm trying to look into a problem with the amount of time it takes us to do a checkout of a large (800 meg) module.
On most of the machine in the shop it takes between 10 and 15 minutes, on one machine it can take an hour.
When I look at top on the cvs server, the process associated with the pulls to that machine get very little cpu.
Is there any kind of scheduling going on inside the cvs server process (aside from blocking for io)?
Harold Lynch
[Prev in Thread] | Current Thread | [Next in Thread] |